4 in 1 Bundle [P6,Complete Schedule Through B.OQ, Estimation, Excel [URDU]

Primavera p6 Complete Training, Learn To Create Complete Schedule Through B.O.Q, Quantity Surveying/Building Estimation With Cad And Excel, Excel For Engineers.

Advanced 0(0 Ratings) 1 Students enrolled Urdu
Created by Mudessar Afraz
Last updated Tue, 16-Aug-2022
+ View more
Course overview

4 in one Package.

1.Primavera P6 Professional Training.

2. Learn To Create Complete Schedule Through B.OQ.

3. Quantity Surveying/Building Estimation With Cad And Excel.

4. Excel For Engineers.



What will i learn?

  • Able Make A Complete Schedule
  • Able to Create a Base line and Update a project
  • Able To Add Resources To Project
  • Able To Create Procurement Schedule
  • Able To Create Financial S-CURVE
  • Stacked Histogram
  • Able to make complete time schedule Through B.O.Q
  • Able to Create W.B.S From B.O.Q
  • Able To Create Cost loading sheet in Excel From B.O.Q
  • Able to use Excel in planning
  • Able to link the activities as per sequence
  • Estimation Of Complete Project Through Auto-cad And Excel
  • Mode Of Payments To Contractor
  • Interim Payment In Excel
  • Microsoft Excel For Beginners
Requirements
  • minimum understanding for planning and scheduling
  • Primavera P6 software installed in your computer
  • minimum understanding of construction processes
Curriculum for this course
155 Lessons 21:15:40 Hours
Critical Path Method
2 Lessons 00:21:33 Hours
  • Critical Path Method In Detail Part 1
    00:14:13
  • Critical Path Method In Detail Part 2
    00:07:20
Importance
1 Lessons 00:02:58 Hours
  • Importance Of Primavera P6
    00:02:58
Enterprise And Organizational Break down Structure
2 Lessons 00:13:58 Hours
  • Organizational Break Down Structure (O.B.S)
    00:06:43
  • Enterprise Project Structure (E.P.S)
    00:07:15
Calendar, Project W.B.S And Activities
5 Lessons 00:47:27 Hours
  • User Preferences
    00:04:53
  • How to Create Calendar In P6
    00:09:40
  • How to Create Project W.B.S And Activities In P6
    00:20:32
  • Milestone And Relationship In Detail
    00:08:02
  • Scheduling Project In Detail
    00:04:20
Creating And Assigning Resources
3 Lessons 00:29:17 Hours
  • Steps Before Loading Resources
    00:07:17
  • How Resource Loading Works In P6
    00:05:00
  • Creating And Assigning Resources
    00:17:00
Resource Leveling
2 Lessons 00:17:30 Hours
  • Resource Usage Profile And Spread Sheet
    00:10:30
  • Leveling Resources
    00:07:00
Updating And Monitoring
3 Lessons 00:27:18 Hours
  • Creating And Assigning Baseline To Project
    00:09:00
  • How to Update The Project
    00:08:07
  • Look a Head Schedule Using Filters
    00:10:11
Reporting
2 Lessons 00:22:19 Hours
  • How to Create Reports In P6
    00:15:03
  • Import And Export In P6
    00:07:16
Material Procurement
1 Lessons 00:10:06 Hours
  • Material Procurement In P6
    00:10:06
Some Important Topics
4 Lessons 00:25:56 Hours
  • Global Change In P6
    00:06:52
  • Activity Codes
    00:09:28
  • Duration Type
    00:04:34
  • Fast Tracking And Crashing
    00:05:02
Document Management And Overtime
2 Lessons 00:12:55 Hours
  • Document Management In P6
    00:05:48
  • Adding Overtime In P6
    00:07:07
Role,S-Curve And Resource Histogram
3 Lessons 00:21:26 Hours
  • Roles
    00:07:52
  • S-Curve In P6
    00:09:13
  • Resource Histogram
    00:04:21
Excel Training
9 Lessons 00:54:59 Hours
  • Font Panel
    00:05:17
  • Border Option
    00:06:14
  • Alignment Panel
    00:06:05
  • Number Panel
    00:07:10
  • Formulas In Excel Part 1
    00:06:29
  • Formulas In Excel Part 2
    00:05:13
  • Formulas In Excel Part 3
    00:05:58
  • Formulas In Excel Part 4
    00:07:52
  • Conditional Formatting
    00:04:41
Complete Schedule Through Bill Of Quantity (B.O.Q)
23 Lessons 03:23:51 Hours
  • How to Create Activity List In Excel
    00:06:38
  • Project W.B.S And Activities
    00:09:21
  • Relationships
    00:04:10
  • B.O.Q Overview
    00:10:27
  • W.B.S And Activity List Part 1
    00:10:39
  • W.B.S Activity List Part 2
    00:16:10
  • Creating W.B.S In Primavera From B.O.Q
    00:11:18
  • Activity Codes In P6
    00:08:29
  • Import Activities From Excel Sheet To P6
    00:10:31
  • How to Assign Activity Codes
    00:10:01
  • How to Give Duration To Activities
    00:04:34
  • How to Give Relationship To Activities Part 1
    00:03:57
  • How to give relationship to Activities Part 2
    00:05:33
  • How to Give Relationship To Activities Part 3
    00:09:42
  • How to Give Relationship To Activities Part 4
    00:08:07
  • Import Project Cost From Cost Loading Sheet To P6
    00:08:43
  • Shop Drawing Submittal And Approval In P6
    00:11:20
  • Material Submittal And Approval In P6
    00:13:33
  • Shop Drawing Submittal Log In Excel
    00:09:13
  • Procurement Tracking Chart in Excel
    00:07:19
  • Estimate Daily Manpower And Duration
    00:03:12
  • How to Import Resources From Resource Loading Excel Sheet To P6
    00:13:08
  • How to Review Primavera Time Schedule Before Sending It To Client Or Consultant
    00:07:46
Introduction To Estimation
3 Lessons 00:24:29 Hours
  • Introduction To Estimation
    00:16:54
  • Measurement From In Excel
    00:06:34
  • Practice Question For This Module
    00:01:01
Foundation Work
6 Lessons 00:29:48 Hours
  • Excavation For Foundation
    00:10:04
  • P.C.C For Foundation
    00:04:16
  • Formwork For Foundation
    00:09:04
  • R.C.C For Foundation
    00:03:33
  • Practice Question 1 For This Module
    00:01:24
  • Practice Question 2 For This Module
    00:01:27
Column Necks
3 Lessons 00:09:21 Hours
  • Formwork For Column Necks
    00:04:54
  • Concrete For Column Necks
    00:03:26
  • Practice Question For This Module
    00:01:01
Grade Beams
5 Lessons 00:44:03 Hours
  • Formwork For Grade Beams Part 1
    00:16:03
  • Formwork For Grade Beam Part 2
    00:13:02
  • Concrete For Grade Beams
    00:07:06
  • Concrete For Grade Beams Part 2
    00:06:41
  • Practice Question For This Module
    00:01:11
Slab On Grade
2 Lessons 00:19:18 Hours
  • Concrete For Slab On Grade Part 1
    00:12:09
  • Concrete For Slab On Grade Part 2
    00:07:09
Column In Super Structure
2 Lessons 00:11:24 Hours
  • Concrete For Column in Superstructure
    00:09:24
  • Practice Question For This Module
    00:02:00
Brick Works In Superstructure
3 Lessons 00:32:33 Hours
  • Brick Works In Superstructure Part 1
    00:16:22
  • Brick Work In Superstructure Part 2
    00:15:15
  • Practice Question For This Module
    00:00:56
Stairs
2 Lessons 00:25:05 Hours
  • Formwork For Stairs
    00:15:18
  • Concrete For Stairs
    00:09:47
Slab
3 Lessons 00:29:27 Hours
  • Formwork For Slab
    00:17:31
  • Concrete For SLAB
    00:11:15
  • Practice Question For This Module
    00:00:41
Parapet Wall And Mumty
2 Lessons 00:08:52 Hours
  • Brick Work In Mumty
    00:07:24
  • Practice Question For This Module
    00:01:28
Plaster Works
6 Lessons 00:59:25 Hours
  • Internal Plaster Part 1
    00:10:21
  • Internal Plaster Part 2
    00:13:16
  • Stair Plaster
    00:15:00
  • Ceiling Plaster
    00:15:00
  • External Plaster
    00:05:06
  • Practice Question For This Module
    00:00:42
Tile And Marble
5 Lessons 00:44:13 Hours
  • Quantity Of Tiles In Toilet
    00:08:18
  • Quantity Of Marble On Floor
    00:13:09
  • Quantity Of Skirting
    00:16:55
  • Quantity of marble on Stairs
    00:05:04
  • Practice Question For This Module
    00:00:47
Paint Works
3 Lessons 00:21:43 Hours
  • Internal Painting
    00:15:34
  • Stairs Ceiling And External Painting
    00:05:33
  • Practice Question For This Module
    00:00:36
Bar bending Schedule Basics
8 Lessons 00:46:29 Hours
  • Bar Bending Schedule Basics
    00:05:32
  • Procedure To Find out Cut Length Of Main Bar
    00:05:56
  • Overlapping
    00:07:46
  • Cut Length Of Crank Bar
    00:06:29
  • Cut Length Of Rectangular Stirrup
    00:03:31
  • Cut Length Of Triangular Stirrup
    00:07:51
  • Cut Length Of Diamond Stirrup
    00:04:41
  • Cut Length Of Circular Stirrup And Chair Bar
    00:04:43
How to prepare Excel Sheet For B.B.S
3 Lessons 00:16:37 Hours
  • How to Prepare B.B.S Sheet In Excel Part 1
    00:07:05
  • How to prepare B.B.S Sheet in excel part 2
    00:08:37
  • Practice Question For This Module
    00:00:55
Bar Bending Schedule For Different Structures
11 Lessons 02:00:21 Hours
  • How to Prepare B.B.S For Foundation
    00:14:03
  • How to Prepare B.B.S For Column Necks
    00:14:20
  • How to Prepare B.B.S For Columns
    00:11:37
  • How to prepare B.B.S For Grade Beam Part 1
    00:19:24
  • How to Prepare B.B.S For Grade Beam Part 2
    00:08:36
  • How to Prepare B.B.S For Stairs
    00:18:00
  • How to Prepare B.B.S For Slab Part 1
    00:18:00
  • How to Prepare B.B.S For Slab Part 2
    00:14:00
  • Practice Question For This Module 1
    00:00:45
  • Practice Question For This Module 2
    00:00:33
  • Practice Question For This Module 3
    00:01:03
Procedure To Find out Material
3 Lessons 00:09:23 Hours
  • How to Find out Material Part 1
    00:03:47
  • Procedure To Find out Material Part 2
    00:02:50
  • How to Find out Material Part 3
    00:02:46
Material Statement In Excel
5 Lessons 00:36:14 Hours
  • How to Prepare Material Statement Sheet In Excel Part 1
    00:07:56
  • How to Prepare Material Statement Sheet In Excel Part 2
    00:13:01
  • How to Prepare Material Statement Sheet In Excel Part 3
    00:05:39
  • How to Prepare Material Statement In Excel Part 4
    00:08:54
  • Practice Question For This Module
    00:00:44
Rate Analysis
8 Lessons 01:45:59 Hours
  • Introduction To Rate Analysis
    00:07:14
  • Rate Analysis For Excavation
    00:00:00
  • Rate Analysis For R.C.C Works Part 1
    00:16:50
  • Rate Analysis For R.C.C Works Part 2
    00:18:14
  • Rate Analysis For Brick Works
    00:18:21
  • Rate Analysis For Plaster Works
    00:17:35
  • Rate Analysis For Tile Works
    00:15:24
  • Rate Analysis For Paint Works
    00:12:21
Bill Of Quantity
1 Lessons 00:07:57 Hours
  • How to Create B.O.Q
    00:07:57
Mode Of Payments To Contractor
8 Lessons 01:01:26 Hours
  • Mode Of Payments To Contractor
    00:07:16
  • Advance And Secured Advance
    00:03:36
  • Final Payment And Mobilization Advance
    00:12:57
  • How to Prepare Interim Payment In Excel Part 1
    00:12:59
  • How to Prepare interim Payment In Excel Part 2
    00:05:18
  • How to Prepare Interim Payment In Excel Part 3
    00:04:41
  • How to Prepare Interim Payment In Excel Part 4
    00:08:17
  • How to Prepare Interim Payment In Excel Part 5
    00:06:22
Resources
1 Lessons 00:00:00 Hours
  • Resources to Download (Excel Sheets ,Drawing Files,B.B.S Sheets,B.O.Q,Projects)
    .
+ View more
Other related courses
04:12:43 Hours
Updated Tue, 16-Aug-2022
5 4 10000₨ 2000₨
05:54:06 Hours
1 5 12000₨ 2000₨
About instructor

Mudessar Afraz

Civil Engineer

9 Reviews | 85 Students | 10 Courses
Planning Engineer Quantity Surveyor
Student feedback
0
0 Reviews
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Reviews

25000₨ 5000₨
Includes:
//send gift when already purchased by user